Fall Prevention Planning

"An ounce of prevention is worth a pound of cure"

Friday, April 3, 2015
Posted by Unknown

New Energy Innovation Center

"Turning an existing 1960 supermarket building into a LEED platinum building is no easy task. But that's exactly what San Diego-based ARCHITECTS hannah gabriel wells did with the new Energy Innovation Center in San Diego that was completed in January 2012."



Friday, March 20, 2015
Posted by Unknown

New EPDs Give Specifiers the Whole Picture

"How metal panels contribute to environmental goals."



Friday, February 20, 2015
Posted by Unknown

Big Push to Staff Shale-Gas Projects

"Project boom drives solutions to shortfalls in craft, tech and management jobs."






Friday, February 13, 2015
Posted by Unknown

Despite Challenges, Region Poised For Growth

"Renewed global demand for U.S. products should help rev the engines in the manufacturing-rich Midwest."



Friday, January 23, 2015
Posted by Unknown

Polishing Up Old Capitol

"Improvements planned for Corydon site for Ind. bicentennial."


Friday, January 9, 2015
Posted by Unknown

Year after federal lawsuit, Vigo County Jail overcrowding problem persists

"The census reports look good, but we need to find out about the overcrowded units and recreation time for the inmates," Falk

Click HERE to read the full article
Friday, January 2, 2015
Posted by Unknown

Fire Preparedness

This article reminds me of when I was in school. It's an interesting perspective on a big picture issue.
     -Mark

Wednesday, September 3, 2014
Posted by Unknown

Preconstruction Budget Risks for Local Government Projects (3 of 3)

Part Three: Human Error and the Unknown


On any local government construction project, human beings design and build every aspect and every human is fallible.  Anyone who says they can build a perfect job on a school or jail or courthouse is lying. 
After decades in the business, Shireman Construction has built up a list of “lessons learned” that we use as a checklist to eliminate errors. We catch numerous design errors and poor choices and save the owner money on every job we work as a construction manager.


In fact, most of the cost savings are wrung out of the job in the design stages –see the graph above. That’s why it’s critical to get a CM on board as early as possible to team closely with the Architect and bring a fresh set of eyes to a project.
But try as we might, there is no way to eliminate all unforeseen costs on a construction projects. The “unknown” is a big risk, and on new construction you might uncover rock, sinkholes, or old buried fuel tanks that the geotechnical report couldn’t catch.
On renovations you might uncover previously unknown asbestos, pests, structural problems, lead paint, poor foundations, etc. that were undiscovered despite thorough investigations by the design team.
Then there’s human error. The architects and engineers make tens of thousands of decisions and product choices, and all of them won’t be perfect. A team of low-bid contractors will go out and dig a hole in the ground and build a multi-million dollar facility from scratch.
So knowing that we’re all human and some mistakes and unforeseen challenges will emerge, Shireman uses a unique “built-in contingency” system to plan ahead.
Within each low bid contract will be contingency funds to be used when unforeseen difficulties emerge, with the approval of Shireman, the architect and owner.
What make this so great? Because we have planned ahead together, and the funds can be expended and issues promptly fixed in the field.
For government officials, this also means that instead of going over numerous “change orders” and annoying the general public in open meetings, these issues can be planned for and adjusted immediately in the field. Imagine monthly public meetings where instead of approving every tweak and minor change order request while the project is held up, you can truthfully report to the satisfied taxpaying public that the project remains under budget.


By planning ahead for the unknown and human errors on local government construction the project budget will be saved and the public will be happy.

Thanks for reading our three-part series on preconstruction budget risks.


Let us help you avoid budget pitfalls. 

For more tips and tricks on local government construction and real life examples – see our website at ShiremanConstruction.com
Tuesday, August 26, 2014
Posted by Unknown

Concrete Repair: Taking the First Steps

Concrete repair is much more than "Let's jump in and do a patch." Interesting article here:
     -Mark

Wednesday, August 20, 2014
Posted by Unknown

Preconstruction Budget Risks for Local Government Projects (2 of 3)

Part Two: Single Source Specifications


     The second way Shireman Construction sometimes serves as the “bad guy” in the preconstruction design meetings on local government projects to save your project budget is fighting single-source specifications. Your architect will put together (with our help and advice) a list of every product in the building, usually the size of two to three large phone books. This is called the “Spec Book” and is part of the bidding documents.
ART: Single Source Specifications – Pictures of Shireman spec books

     Usually the architect will specify materials with multiple manufacturers and suppliers. But occasionally the design team or the local government staff in love with a certain product will list a product with only one supplier. 
     Unfortunately, the supplier can also read that they are the only source allowed for that product and will sometimes take advantage and double or triple their price. On large components, like detention equipment for jails, major heating and cooling system components, generators, controls, etc., this could blow up your entire budget. 

     So we read every word in those books with our team of specialty subcontractors before they go out to public bid. We work to find ways to list multiple suppliers and alternative products to keep everyone honest.
     Also, if there is a product later that the Owner’s team or architect must have, we can use alternates to keep all the pricing honest. By fighting single-source specifications with alternates we can get it substituted at a lot lower price level later than just listing it alone.

Let us help you avoid scope creep and other budget pitfalls. For more tips and tricks on local government construction and real life examples – see our website at ShiremanConstruction.com



Check back next week (August 26) for part three of this series.
Tuesday, August 19, 2014
Posted by Unknown

Insulation: Going Green

Many gurus believe that building efficiency can be boiled down to proper use of efficient insulation. This article talks more about proper energy-efficient insulation.
     - Mark


Wednesday, August 13, 2014
Posted by Unknown

Preconstruction Budget Risks for Local Government Projects (1 of 3)

Part One: Scope Creep

     There are a few common problems we often encounter and battle during the preconstruction process performing construction management in the Louisville, KY and the Southern Indiana region.
     Let’s talk about a major problem that has busted probably the most budgets across the country for school boards, county governments and all local leadership. The biggest challenge of keeping any construction project on budget is managing “Scope Creep.” Scope creep occurs when well-meaning architects and designers and the local government staff get carried away in the “visionary” stages and design process. Quickly the building begins to increase in square footage and cost as everyone’s wish list is fulfilled after years of working in what was oftentimes an older, small, inadequate space. 



     But local government projects like schools, jails and courthouses have a budget for a reason – usually it is all the community can afford or all the tax revenue stream available.
It’s pretty understandable as architects have been taught and trained to give the client exactly what they want from about the first day in architecture school. Unfortunately in the architecture profession often the designer that came up with the preliminary budget is different than the designer drawing the plans. Often times Shireman will have to be the “bad guy” in meetings with the architect or even save the local government staffers with big dreams - from themselves
     Shireman will help control scope creep by being the government’s voice in all design meetings, reminding the design team about cost issues and using our latest in house real construction costs to keep the budget on track. Value engineering of the design is also critical. We constantly review and update the project budget and propose alternative ways to achieve everyone’s goals.  Managing scope creep keeps everyone on the right track and leads a project to a financial success.

For more tips and tricks on local government construction and real life examples – see our website at ShiremanConstruction.com

Check back next Tuesday (August 19th) for part two of the series.
Tuesday, August 12, 2014
Posted by Unknown

Landscape Design Can Save You Money

     The ability to design and build good landscaping can buffer your building from winter winds, enhance summer cooling, prevent soil erosion and surface run off, and some grasses work to reduce pollutants before they seep into the underground water table. 


     Therefore, if your site and initial budget allow the introduction of the these concepts, incorporate into your design – you’ll be a step closer to better building efficiency.

  • The best daylighting and passive solar gain is achieved when your building faces southeast, southwest, or south.
  • Bodies of water and special landscaping can help moderate air temperatures.
  • The shade of deciduous trees can help cool your building in summer.
  • Well drained sites can help protect your building’s materials
  • Specially designed wind breaks can protect your building during cold winter winds.


Monday, July 21, 2014
Posted by Unknown